Home/Answers/Custom
SAUNA COST LAB / Custom

Custom Checklist

For Custom, follow a checklist: backup, format, size/quality, output, spot-check.

Updated 2026-11-01About 3 minLocal test
Quick answer

For Custom, follow a checklist: backup, format, size/quality, output, spot-check. Custom depends on size/design/material/engineering.

Why it matters

A fixed checklist prevents skipping the critical step.

Size.

Step by step

  1. Check type/size/electrical/ventilation/waterproofing/location.
  2. Separate kit/custom/heater/electrical/insulation.
  3. Get 2-3 quotes; confirm type/electrical/warranty.
  4. Contract states scope/electrical/payment/warranty.

Common mistakes

  • Equipment price only, not electrical/ventilation.
  • Ignoring waterproofing/insulation/location.
  • Not checking heater/warranty.
  • No electrical/payment terms.

Checklist

  • Type/size/electrical/ventilation/waterproofing.
  • Kit/custom/heater/insulation.
  • Location/drainage/permits/safety.
  • Warranty/payment/contract.
  • Budget/maintenance/health.

Key facts

  • Size.
  • Design.
  • Engineering.

FAQ

What is a Custom checklist?

For Custom, follow a checklist: backup, format, size/quality, output, spot-check. Custom depends on size/design/material/engineering.

How long does it take?

Usually 1-3 minutes; for intermittent issues, run 30 seconds and retest elsewhere.

Is data uploaded?

Runs locally and does not upload video/audio; extensions may still read the page.

Source: HomeAdvisor